A-Z of External projects Back to External. An A-Z of this web site.  
External...    Site Index...
Chiterns cycle route. Brown's Wood 3.
< Chiltern Trail Brown's Wood 3 >
BROWNS WOOD LOCAL PLAY 1

Working drawings were hand drawn, for speed and versatility.
Construction is of coated mild steel with oak leafs and end posts.
Working drawing (post detail), click to return to introduction.
Working drawing (Steel and timber gates), click to return to introduction.
The gate's wings are intended to melt into the heavily planted weldmesh surround. Working drawing (foot detail), click to return to introduction.


Return to introduction...
An A-Z Index of this site An A-Z index of External projects.
A-Z of External Projects...HOME PAGE
A-Z Site Index...
Email: justin@tunley.co.uk
© Justin Tunley . 12 Pattison Lane . Woolstone . Milton Keynes MK15 OAX . Tel/Fax + 44 (0) 1908 240 119

General layout. |  Gates.
Previous subject: Chiltern Heritage Trail | Back to External |  Home page |  Next subject: Browns Wood Local Play 3.
Site index |   External design index.