Dormer loft sequence (Flat roof)



1.
UPVC double-glazed windows now fitted. Flat roof complete with decking and first layer of felt on. Because of the method of construction we adopt, external works are kept watertight throughout.



2.
View of different conversion site showing same flat roof dormer. Note: structural steels required here, these are splice-jointed in order to achieve easy access to roof space.



3.
Here we arrive at the structural floor layout complete with steels. the perimeter constructed with staircase in position.



4.
New stairs in position with existing panels to original stairs, about to be removed. With new spindles fitted to match staircase to loft.



5.
Original roof timbers now removed and external framework of dormer erected. Water tank moved to a temporary position awaiting final location to be constructed.



6.
Windows fitted with lead work under. Flat roof ready for final layers and tiling started.



7.
View from new staircase into finished room. Cupboard storage area from landing with access door.



8.
Internal plastering complete with final works now having been carried out.



9.
Tiling well underway, running into side cheeks of UPVC windows. This then has a silicon sealant applied at this joint. The small extension pitched roof is being renewed at this stage. Any additonal works which may become apparent are brought to the client's attention. Should they wish for these works to be carried out during this period, we will be happy to price for them.



10. View from the new loft room out through the entrance door and down the stairs. Electrical works complete. Note the access door to cupboard areas and access panel to the new water tank.



11. All handrails are now fitted with a chamfered edge, spindles between. The stairparts can be made to match the exisitng where required.